The base of the water pump of the water company that was produced was damaged and did not allow the pump to function - bringing an alternative base from abroad required a three-month supply time - we dismantled the base on the ground, our engineering team carried out necessary measurements and planned an alternative pump base
Which can be used for the production of rolled and welded steel plates that are machined and painted - we created the replacement base within a few working days and replaced the damaged base with the new one.